www.mamboteam.com
ECOWET  
Home
Thursday, 28 August 2008
 
 
Main Menu
Home
Study Contents
Study Outputs
Study Structure
Links and Documents
Contact Us
Search
Stakeholder
CB Online
No Users Online
Welcome

Welcome to ecowet-domestic.org


This site provides information on the preparatory studies for ecodesign of EuP products, lot 14 i.e. for domestic washing machines and dishwashers.
 
This site is under constant evolution, please visit regularly to follow the progress of this study. By registering as a stakeholder, you can stay informed of latest additions to this site. 

Recently Posted Documents (20/04/2008):  

The Draft Final Version of the task 7 has been posted in the Study Outputs/Draft Documents section.

Important Note:

The contents of Subtask 7.6 "HYPOTHESISED POLICY MEASURES FOR WASH APPLIANCES" represent the consultant's views and do not constitute any agreement with or commitment of the European Commission.

As specified since the very beginning of this EuP preparatory study, the definition of policy options remains a prerogative of the European Commission. Stakeholders are therefore invited to refer to DG TREN officials for presenting any feedback or position on this Lot policy proposals, while any comment about the technical content of Subtasks 7.1-7.5 can be addressed to us.


Recently Posted Documents 29/02/2008):  
Task 7, version 2.1 (almost completed). The report has been posted in the Study Outputs/Draft Documents section.
Important Note:  The contents of Subtask 7.6 "HYPOTHESISED POLICY MEASURES FOR WASH APPLIANCES" represent the consultant's views and do not constitute any agreement with or commitment of the European Commission.
As specified since the very beginning of this EuP preparatory study, the definition of policy options remains a prerogative of the European Commission. Stakeholders are therefore invited to refer to DG TREN officials for presenting any feedback or position on this Lot policy proposals, while any comment about the technical content of Subtasks 7.1-7.5 can be addressed to us.

 Recently Posted Documents (18/12/2007):
The reports of Tasks 4, 5 and 6 have been posted in the Study Outputs, Final Publications section.
No changes to these documents have been provided so far

Recently Posted Documents (27/11/2007):
The reports of Tasks 1, 2 and 3 have been posted in the Study Outputs, Final Publications section. Tasks 2.3 and 3 have been further reviewed and amended.Morover he following new reports has been posted in the Study outputs/Draft document section: Task 7: draft partial report for consultation:
- Subtasks 7.3, 7.4, 7.6 to be completed
- Subtasks 7.5 to be done
 

Recently Posted Documents (13/11/2007):

The following new reports has been posted (13/11/2007): 

Task 5: updated final version with some comments about recycling and disposal costs implemented (see comment at page 65)Task 6: Sensitivity analysis enhanced.  System analysis finished


Next Meeting announcement

The final meeting has been held in Brussels. No more meetings are foreseen for the moment

Recently Posted Documents (01/10/2007):
The following new report has been posted (01/10/2007): 
Power Point presentations, look at: Study Outputs/meetings/final meeting

Recently Posted Documents (25/09/2007):
The following report has been posted (25/09/2007): 
Task 6: Revised version:
- Subtask 1.5.3 Trade off analysis implemented
- Subtask 1.6 (Environmental assessment) implemented

Recently Posted Documents (24/09/2007):

The following new report has been posted (24/09/2007): 

Task 7, subtasks 7.1 (BaU scenarios) and 7.2 (Manufacturer Impact Analysis)


Recently Posted Documents (19/09/2007):
The following report has been posted (19/09/2007): 
Task 6: Revised version:
- BNATs analysis added; a sistematic mistake about dishwasher energy efficiency index has been corrected;
- Subtask 1.5.3 System Analysis implemented with the standby description and tradeoff analysis to be completed.
- Subtask 1.6 (Environmental assessment) to be added by Monday 24th.

 Recently Posted Documents (06/09/2007):
The following new report has been posted (06/09/2007): 
Task5 - final draft - the main upgrading concerns the updating of the subtask 5.1 (definition of the base case) and the re-editing and completion of the Base Case environmental analysis. In particular a comparison of the LCA results between the EUP-report and the SIMAPRO tools has been carried out. (Study Outputs/Draft/Task 5)

 Recently Posted Documents (06/08/2007):
The following three new reports have been posted (06/08/2007): 
Task2 - final draft - the main upgrading concerns the introduction of the EU 10 stock and energy consumption figures (Study Outputs/Draft/Task 2)
Task4 - final draft (Study Outputs/Draft/Task 4)
Task 6 - version 2: the technological innovation analysis, including the sensitivity analysis, have been completed (Study Outputs/Draft/Task 6)

Recently Posted Documents (29/06/2007):
The following document has been posted (20/07/2007): 
 Task 1 Version 3 ("Study Outputs/Draft/Task 1") 
 The following document has been posted (29/06/2007): 
Minutes and presentations of the expert meeting held in Brussels the days 12th and 13th of April 2007
The following documents have been posted (13/06/2007):
 Task 2, version 1 ("Study Outputs/Draft/Task 2")
Task 3, final draft version ("Study Outputs/Draft/Task 3")
Task 4, version 1 ("Study Outputs/Draft/Task 4")
Task 5, version 1 ("Study Outputs/Draft/Task 4")
 The following documents have been posted (04/06/2007):
The interim report, containing tasks 1-5 has been posted in the "Study Outputs/Draft/interim report section"
The following documents have been posted:
The final version of task 1 carryng out the observations of the reviewers has been posted in  the "Study Outputs/Draft/Task 1" section
The draft version of task 6.1 has been posted in the "Study Outputs/Draft/Task 6"
The  final draft of task 4 has been posted in the "Study Outputs/Draft/Task 4" section 
The presentations of the February meeting have been posted in the "Study Outputs/Meeting" section 
 
 
Top! Top!